[Project name] Coal yard closure and reconstruction project
[Project Overview] The workshop is 181.2 meters long, 98 meters wide, and 12.7 meters high, with a total construction area of 17,757 square meters.
[Project Features] Large-span angle steel truss structure, with a single span of 49 meters, and the roof adopts Baosteel color-coated plate TSINRSS468 roofing system.
【Construction time】2017
[Construction location] Boxing County, Binzhou City, Shandong Province