[Project name] Xujiahu Equipment and Material Depot Project
[Construction time] 2025[Construction location] Linyi City, Shandong Province
Construction overview: This project is a door-type light steel structure, with a workshop length of 54.48 meters, a width of 15.48 meters, a column distance of 6 meters, a single ridge and double slopes, a cornice elevation of 9.0 meters, a daughter wall elevation of 10.0 meters, and a construction area of 843.35 square meters.