{{title}}

type: WORK DESCRIPTION
Address: Cangzhou City, Hebei Province
Construction Company: Hebei Gaoda Yongheng Plastic Products Co., Ltd.
  • Details

[Project Name] Zhongkong Empty Product Production Project

[Project Overview] The workshop is 184.48 meters long, 48.48 meters wide, 13.8 meters high, and has a construction area of 13,433.83 square meters.

[Project Features] The roof adopts Baosteel's 0.5mm thick TSINRSS468 roofing system, the walls adopt Baosteel's 0.5mm thick 840 two-color combination plate type, and the parapet adopts an overhanging parapet.

【Construction time】2022

[Construction location] Huanghua City, Cangzhou City, Hebei Province

{{item.userid}} {{item.addtime}}
{{item.content}}